Alex Pommier / Friday, October 7, 2016 / Categories: Uncategorized ATI Drilling personnel work with HydroGeoLogic field project managers at various sites At MacDill AFB, ATI Drilling personnel worked with HydroGeoLogic field project managers at various sites. ATI installed a total of 10 Monitoring Wells with specific designs/applications and numerous Soils & Water Samples: 7 Monitoring wells via Direct Push Technology. Two Monitoring wells were installed to 30’ BLS with a 2’ section of screen at 30’, 20’, and 10’ to allow for easier and more accurate sampling. All seven wells were completed with a layer of 20/30 sand, 30/65 sand, Bentonite crumbles, and a 2’x2’x4” Concrete pad and Manhole Covers. Next Article New Video: Success Story at the Panama Canal Expansion Project Print 3027 Rate this article: No rating Tags: Drilling Please login or register to post comments.